the basin – day 516

fogest in action

PS your world hasn’t changed, just how you view it has

knowing

is knowing enough
  now that it is a memory
it is like the infinity 
  and loneliness of "I"

the basin – day 515

a flight of fancy

PS your world hasn’t changed, just how you view it has

Whisper

When we whisper our
dreams, do they fall 
away from us

Are they a soft spring 
rain lit by the morning sun

the making of dreams
are held in Rainbow and
wishes

whispers fall like the 
promise of a long awaited
spring
swaying gently in the
wind of our dreams
swirl, twirl, fade
reformed to our need

the basin – day 514

foggy with a chance of rain

PS your world hasn’t changed, just how you view it has

Kindness

The kindness of others
is the warmth of the 
midday sun
is easy to appreciate. 
A hello, a smile, a nod.
Chimes break the 
silence, memories 
of love, cherished moments
hugs of gratitude, love
appreciation, togetherness
the kindness of others
is something to behold,
a gentle swaying 
of the harmonies of
love.
Can undo untold hurts
if you let them in.
The kindness of others
is outside of self.
Being on the 
outside looking in,
kindness is all that 
matters.

the basin – day 513

only a tinge of smoke in the air this morning

PS your world hasn’t changed, just how you view it has

the basin – day 512

for some reason, nay sawyers say this is anomaly and not the new reality – as this smoke is now happening each year, it looks a new reality from here

PS your world hasn’t changed, just how you view it has

Satisfaction: A job well done–my 24 kitchen

I have a new kitchen. I call it my 24 kitchen,  All of the appliances are 24inches wide.

I took the leap last year and bought a condo outside of Victoria.  It had an old and tired feel to it.  Some poor soul thought that it was a good idea to paint it, so they did.  Everything including the counter.  It looked great on photos however keeping it clean was impossible as the painted counter top had a sand mix to make it look like granite, They forgot the last coat of epoxy and it was like cooking on  and cleaning  sandpaper.  So, we gutted it and started fresh. 

image

The first to go was the fridge and stove.  We had a good fridge and I would rather have a washer and dryer.  Next the counters, we took them out in stages with the old cupboards below.  To fill the needs of the kitchen we bought an old oak side board.

DSC02923

Then we budgeted and planed.  Ikea cupboards were selected as my partner and I were good at putting things together.  The Ikea planner was really helpful.  I found the appliances that would fit this small space (6*10) and then the fun really began.

Every thing but the kitchen sink was removed. The washer and dryer were movable and worked as our defunct kitchen. Yes, the kitchen sink is on saw horses.  It worked but was a pain to do much more than the basics and we ate out a lot during this part.

 

DSC03066

We sanded, primed and painted the walls.  The electrician came, ripped out some drywall and installed new lines for the new cook top, built in  wall oven oven and the dishwasher.

 

DSC03088DSC03265

We called the plumber to properly hook up the washing machine, so more wall had to be removed, the plumbing was also updated with new lines and bits. 

 

DSC03260

We stared the setup for the new cupboards.  They reach the ceiling giving us more space and clean line.  This was fun, like putting together a Lego castle. The drywall was replaced, mudded, sanded, primed and painted. 

DSC03266

The blue is the plastic protecting the finish. It only came off as we finished working in that area.

DSC03316

We had removed the old sink and that meant dish duty was a laborious affair in the bathroom sink.  We used a toaster oven and some induction cook plates (for 5 years actually – long story!)

DSC03320

The plumber came back to hook up the sink and the dishwasher.  The dishwasher is the white drawer in the picture below.  Perfect size for the two of us.  Love it!

DSC03331

Then we had the electrician back to hook up the juice for dishwasher and cooktop. The empty space is for the wall oven that was damaged in shipping. Bummer but it happens.  And we couldn’t finish the bottom until the oven arrived.  All of the appliance in my new kitchen are 24 inches. So we had to do some serious mods to the bottom cabinets to fit the appliances.  And it worked beautifully!

 

DSC03519

So, after 11 month and 10 days, I have a decent working kitchen! The floor is next but will have to wait as I blew the budget. And for the first time in 5 years, I have a great working oven and cooktop.